Tuesday, April 7, 2009
Glass Cockpits on Commerical Aircrafts
Behind the ScreenMar 25, 2009
By Mike Gamauf
Since the earliest days of aviation, pilots have been staring at gauges to help ascertain the condition of their machines and the world around them. Orville and Wilbur had three instruments on their first Flyer: a stopwatch, an anemometer for measuring wind speed and a tachometer. Subsequently and especially since the introduction of instrument flight and the development of the standard T cluster, engineers managed to cover every available inch of cockpit real estate with some type of instrument, button or switch.
As aircraft became more complex, large passenger and military aircraft required a flight engineer to manage the systems and scan the dozens of gauges and lights, thereby freeing the pilots to concentrate on aviating. In the late 1960s and early 1970s, the military sought to de-clutter its cockpits by using small cathode ray tubes (CRT) to replace the mechanical gauges and combine the functions of several instruments onto a computer-generated screen. This was the genesis of the glass cockpit - centering initially on the Primary Flight Display (PFD).
From an aircraft systems perspective, the cockpit's traditional round "steam" gauges provide the flight crew with constant status information. It is up to the pilots to scan the gauges, looking for misbehaving temperatures and pressures. However, unless an advisory threshold is reached, causing the Master caution to illuminate, dangerous trends could go unnoticed until too late. A NASA study completed in the 1970s determined that pilots could be just as safe with a cockpit that provides system status on demand, instead of having information presented continuously via dials or tapes, and with the introduction of "glass," designers embraced that concept. Soon, the rows of steam gauges and banks of caution lights gave way to the Multi-Function Display (MFD). This new display was kind of a general store of aviation data, providing a home for the weather radar, flight planning, GPS navigation aids, enhanced ground proximity warning, TCAS II and even control of the comm/nav radios.
From a maintainer's perspective, the all-glass cockpit is an advance, and not. In many ways, the old electromechanical gauges were easy to maintain. If the thing was inoperative, you replaced it. They were relatively inexpensive and many were TSOed items, which made replacements easy to find. About the worst things that could go wrong were discovering the replacement had a short wire bundle and wouldn't reach the connector behind the instrument panel, or you had to apply tiny pieces of tape to the instrument's face for advisory ranges.
By contrast, an all-glass panel provides a seemingly infinite range of malfunctions: entire screens going dark in flight; mode switching that has a mind of its own; black lines; error codes and good old fashioned inoperable - all accompanied by troubleshooting nightmares. Obtaining replacement displays, which alone cost tens of thousands of dollars, plus the additional electronics like symbol generators, and processors can easily deplete your maintenance reserve budget. Keeping such systems operational and safe can be a resource and management headache.
Most pilots have embraced the all-glass cockpit and find the improved situational awareness tools and functionality beneficial to safe flying. With some flight departments postponing new aircraft purchases, now may be a good time to upgrade the cockpit to take advantage of the latest safety technology. This task usually falls on the maintenance manager's shoulders and there are many options from which to choose. How do you make good choices and end up with the best possible system? We asked fellow maintenance managers and upgrade experts to shine a light on what goes on behind the glass.
By Mike Gamauf
Since the earliest days of aviation, pilots have been staring at gauges to help ascertain the condition of their machines and the world around them. Orville and Wilbur had three instruments on their first Flyer: a stopwatch, an anemometer for measuring wind speed and a tachometer. Subsequently and especially since the introduction of instrument flight and the development of the standard T cluster, engineers managed to cover every available inch of cockpit real estate with some type of instrument, button or switch.
As aircraft became more complex, large passenger and military aircraft required a flight engineer to manage the systems and scan the dozens of gauges and lights, thereby freeing the pilots to concentrate on aviating. In the late 1960s and early 1970s, the military sought to de-clutter its cockpits by using small cathode ray tubes (CRT) to replace the mechanical gauges and combine the functions of several instruments onto a computer-generated screen. This was the genesis of the glass cockpit - centering initially on the Primary Flight Display (PFD).
From an aircraft systems perspective, the cockpit's traditional round "steam" gauges provide the flight crew with constant status information. It is up to the pilots to scan the gauges, looking for misbehaving temperatures and pressures. However, unless an advisory threshold is reached, causing the Master caution to illuminate, dangerous trends could go unnoticed until too late. A NASA study completed in the 1970s determined that pilots could be just as safe with a cockpit that provides system status on demand, instead of having information presented continuously via dials or tapes, and with the introduction of "glass," designers embraced that concept. Soon, the rows of steam gauges and banks of caution lights gave way to the Multi-Function Display (MFD). This new display was kind of a general store of aviation data, providing a home for the weather radar, flight planning, GPS navigation aids, enhanced ground proximity warning, TCAS II and even control of the comm/nav radios.
From a maintainer's perspective, the all-glass cockpit is an advance, and not. In many ways, the old electromechanical gauges were easy to maintain. If the thing was inoperative, you replaced it. They were relatively inexpensive and many were TSOed items, which made replacements easy to find. About the worst things that could go wrong were discovering the replacement had a short wire bundle and wouldn't reach the connector behind the instrument panel, or you had to apply tiny pieces of tape to the instrument's face for advisory ranges.
By contrast, an all-glass panel provides a seemingly infinite range of malfunctions: entire screens going dark in flight; mode switching that has a mind of its own; black lines; error codes and good old fashioned inoperable - all accompanied by troubleshooting nightmares. Obtaining replacement displays, which alone cost tens of thousands of dollars, plus the additional electronics like symbol generators, and processors can easily deplete your maintenance reserve budget. Keeping such systems operational and safe can be a resource and management headache.
Most pilots have embraced the all-glass cockpit and find the improved situational awareness tools and functionality beneficial to safe flying. With some flight departments postponing new aircraft purchases, now may be a good time to upgrade the cockpit to take advantage of the latest safety technology. This task usually falls on the maintenance manager's shoulders and there are many options from which to choose. How do you make good choices and end up with the best possible system? We asked fellow maintenance managers and upgrade experts to shine a light on what goes on behind the glass.
Monday, April 6, 2009
Airbus Sees 480 Deliveries In 2010Apr 6, 2009
Robert Wall/Paris wall@aviationweek.com
Airbus is hopeful it can keep production rates relatively solid, with company chief executive officer for customers, John Leahy, suggesting 2010 could see around 480 deliveries, roughly last year's level and what's targeted for 2009.
The aircraft maker also makes clear it will show little flexibility in shifting 2009 deliveries.
Despite the hope of maintaining output, that doesn't mean Airbus isn't feeling the slow down. In the first quarter, Leahy says he saw around 22 sales campaigns, compared with around 100 during that period when the market was at its peak. There were a further eight VIP aircraft campaigns.
As it stands, Airbus says it remains overbooked for 2009 and 2010. In fact, Tom Williams, Airbus executive vice president for programs, notes that Airbus recently had to start looking at which airlines would not get an aircraft this year after a decision was made to reduce production rates for single-aisle aircraft to 34 units per month starting in October. The situation was eased, somewhat, by German carrier Blue Wings losing its operating license, although the carrier is trying to raise the funds to return and may then want the aircraft. Blue Wings had five Airbus deliveries this year planned and 10 next year.
Leahy says the downside risk on deliveries is about 10-15%, not the 30% some industry officials have suggested.
Airbus has set up a Watchtower Committee to review every aircraft delivery position, including financing. As it sees risk, it is engaging airlines about potential changes in taking the aircraft.
However, Leahy stresses there is little flexibility available for 2009 aircraft, since they are largely in build. Airline's will be required to take those aircraft, even if they would rather not, he indicates to financial analysts. Airbus is showing more flexibility in terms of 2010 deliveries.
That situation holds true also for the Airbus flagship A380. Airbus this year plans to buy 18 of the aircraft, but Leahy acknowledges the delivery situation for all is not assured. But while there me be some room for adjustments on later A380 slots, Leahy says any A380 aircraft scheduled for handover this year would be built and, if an airline isn't ready to take the asset, would have to be put in storage.
Robert Wall/Paris wall@aviationweek.com
Airbus is hopeful it can keep production rates relatively solid, with company chief executive officer for customers, John Leahy, suggesting 2010 could see around 480 deliveries, roughly last year's level and what's targeted for 2009.
The aircraft maker also makes clear it will show little flexibility in shifting 2009 deliveries.
Despite the hope of maintaining output, that doesn't mean Airbus isn't feeling the slow down. In the first quarter, Leahy says he saw around 22 sales campaigns, compared with around 100 during that period when the market was at its peak. There were a further eight VIP aircraft campaigns.
As it stands, Airbus says it remains overbooked for 2009 and 2010. In fact, Tom Williams, Airbus executive vice president for programs, notes that Airbus recently had to start looking at which airlines would not get an aircraft this year after a decision was made to reduce production rates for single-aisle aircraft to 34 units per month starting in October. The situation was eased, somewhat, by German carrier Blue Wings losing its operating license, although the carrier is trying to raise the funds to return and may then want the aircraft. Blue Wings had five Airbus deliveries this year planned and 10 next year.
Leahy says the downside risk on deliveries is about 10-15%, not the 30% some industry officials have suggested.
Airbus has set up a Watchtower Committee to review every aircraft delivery position, including financing. As it sees risk, it is engaging airlines about potential changes in taking the aircraft.
However, Leahy stresses there is little flexibility available for 2009 aircraft, since they are largely in build. Airline's will be required to take those aircraft, even if they would rather not, he indicates to financial analysts. Airbus is showing more flexibility in terms of 2010 deliveries.
That situation holds true also for the Airbus flagship A380. Airbus this year plans to buy 18 of the aircraft, but Leahy acknowledges the delivery situation for all is not assured. But while there me be some room for adjustments on later A380 slots, Leahy says any A380 aircraft scheduled for handover this year would be built and, if an airline isn't ready to take the asset, would have to be put in storage.
Airbus Sees 480 Deliveries In 2010Apr 6, 2009
#content td div img {
padding-right:10px;
padding-bottom:2px
}
html.ie6 #content td div img {
padding-right:10px;
padding-bottom:0px;
}
div.storyContent p {
margin-top: 2px;
margin-bottom: 14px;
}
html.ie6 div.storyContent p {
margin-top: 0px;
margin-bottom: 10px;
}
#mainNav {
margin-top:0px;
}
a {
color: #224e9c;
text-decoration: none;
}
a:hover {
color: #224e9c;
text-decoration: underline;
}
Robert Wall/Paris wall@aviationweek.com
Airbus is hopeful it can keep production rates relatively solid, with company chief executive officer for customers, John Leahy, suggesting 2010 could see around 480 deliveries, roughly last year's level and what's targeted for 2009.
The aircraft maker also makes clear it will show little flexibility in shifting 2009 deliveries.
Despite the hope of maintaining output, that doesn't mean Airbus isn't feeling the slow down. In the first quarter, Leahy says he saw around 22 sales campaigns, compared with around 100 during that period when the market was at its peak. There were a further eight VIP aircraft campaigns.
As it stands, Airbus says it remains overbooked for 2009 and 2010. In fact, Tom Williams, Airbus executive vice president for programs, notes that Airbus recently had to start looking at which airlines would not get an aircraft this year after a decision was made to reduce production rates for single-aisle aircraft to 34 units per month starting in October. The situation was eased, somewhat, by German carrier Blue Wings losing its operating license, although the carrier is trying to raise the funds to return and may then want the aircraft. Blue Wings had five Airbus deliveries this year planned and 10 next year.
Leahy says the downside risk on deliveries is about 10-15%, not the 30% some industry officials have suggested.
Airbus has set up a Watchtower Committee to review every aircraft delivery position, including financing. As it sees risk, it is engaging airlines about potential changes in taking the aircraft.
However, Leahy stresses there is little flexibility available for 2009 aircraft, since they are largely in build. Airline's will be required to take those aircraft, even if they would rather not, he indicates to financial analysts. Airbus is showing more flexibility in terms of 2010 deliveries.
That situation holds true also for the Airbus flagship A380. Airbus this year plans to buy 18 of the aircraft, but Leahy acknowledges the delivery situation for all is not assured. But while there me be some room for adjustments on later A380 slots, Leahy says any A380 aircraft scheduled for handover this year would be built and, if an airline isn't ready to take the asset, would have to be put in storage.
#content td div img {
padding-right:10px;
padding-bottom:2px
}
html.ie6 #content td div img {
padding-right:10px;
padding-bottom:0px;
}
div.storyContent p {
margin-top: 2px;
margin-bottom: 14px;
}
html.ie6 div.storyContent p {
margin-top: 0px;
margin-bottom: 10px;
}
#mainNav {
margin-top:0px;
}
a {
color: #224e9c;
text-decoration: none;
}
a:hover {
color: #224e9c;
text-decoration: underline;
}
Robert Wall/Paris wall@aviationweek.com
Airbus is hopeful it can keep production rates relatively solid, with company chief executive officer for customers, John Leahy, suggesting 2010 could see around 480 deliveries, roughly last year's level and what's targeted for 2009.
The aircraft maker also makes clear it will show little flexibility in shifting 2009 deliveries.
Despite the hope of maintaining output, that doesn't mean Airbus isn't feeling the slow down. In the first quarter, Leahy says he saw around 22 sales campaigns, compared with around 100 during that period when the market was at its peak. There were a further eight VIP aircraft campaigns.
As it stands, Airbus says it remains overbooked for 2009 and 2010. In fact, Tom Williams, Airbus executive vice president for programs, notes that Airbus recently had to start looking at which airlines would not get an aircraft this year after a decision was made to reduce production rates for single-aisle aircraft to 34 units per month starting in October. The situation was eased, somewhat, by German carrier Blue Wings losing its operating license, although the carrier is trying to raise the funds to return and may then want the aircraft. Blue Wings had five Airbus deliveries this year planned and 10 next year.
Leahy says the downside risk on deliveries is about 10-15%, not the 30% some industry officials have suggested.
Airbus has set up a Watchtower Committee to review every aircraft delivery position, including financing. As it sees risk, it is engaging airlines about potential changes in taking the aircraft.
However, Leahy stresses there is little flexibility available for 2009 aircraft, since they are largely in build. Airline's will be required to take those aircraft, even if they would rather not, he indicates to financial analysts. Airbus is showing more flexibility in terms of 2010 deliveries.
That situation holds true also for the Airbus flagship A380. Airbus this year plans to buy 18 of the aircraft, but Leahy acknowledges the delivery situation for all is not assured. But while there me be some room for adjustments on later A380 slots, Leahy says any A380 aircraft scheduled for handover this year would be built and, if an airline isn't ready to take the asset, would have to be put in storage.
Subscribe to:
Posts (Atom)
About Me
- Chalonda Cooper
- My blog page pertains mostly to aviation technology because I had been in the avaition business for 12 years and currently retired to go back to school to further my education in business. The aviation field is very interesting because their is always some type of new and improved technology that is some what amazing and can be appreciated.